CoreDam
Geotechnical
- May 23, 2021
- 1
Pretty new to deep foundation design and our structural is asking for estimated pile lateral capacity. We just completed our subsurface investigation and I haven't received any preliminary loads yet.
I don't have access to LPILE to develop a p-y curve but didn't know if this was standard procedure without any prelim loading. Anticipating 90-100' concrete prestressed square piles in mostly clay.
Thanks
I don't have access to LPILE to develop a p-y curve but didn't know if this was standard procedure without any prelim loading. Anticipating 90-100' concrete prestressed square piles in mostly clay.
Thanks