ARK466
Geotechnical
- Nov 29, 2011
- 2
I am new to the geotechnical field. I am preparing a cost estimate for conduction geotechnical investigation.
Is there a general formula to calculate the time required to drill a borehole using Auger drill? E.g. How long would it take to drill a 10 meter hole using Auger drill?
Is there a general formula to calculate the time required to drill a borehole using Auger drill? E.g. How long would it take to drill a 10 meter hole using Auger drill?