Hi,good afternon dear geotech experts/civil engineers
how to estimate the settlement of soil and consoliodated time of a soil due to dewatering
the details are
maximum excavation=-6.30m
water table=-4.20m
types of shoring=h beam
k=4.62*10^-5m/s
ro=77.52m
rs=26.11m
q=.0161mcube/s
well depth =21m
pls see tha attachment for spt data
how to estimate the settlement of soil and consoliodated time of a soil due to dewatering