lostit40
Civil/Environmental
- Dec 11, 2014
- 6
I am using ETABS 2013 to run an analysis on a 5 storey precast bldg. I wanted to use ASCE 10 equivalent method to develop the base shear on the structure. The problem is I calculated the base shear around 720 kips and ETABS is registering 220 kips. I looked at the parameters and I have in all the factors (R, omega & Cd) correctly. I really do not know what I'm doing wrong.