beyond86
Electrical
- Sep 24, 2017
- 146
Hi! Need yours help with ETAP and check synchronization.
I'm trying to make condition when two independent systems unite by closing intertie CB. So I need to set some angel between two systems and then check synchronization with some parameters. How I can to setup angle between voltage in ETAP?
Thanks!
I'm trying to make condition when two independent systems unite by closing intertie CB. So I need to set some angel between two systems and then check synchronization with some parameters. How I can to setup angle between voltage in ETAP?
Thanks!