FrankieAugust
Electrical
- Jan 10, 2024
- 13
Hi all,
I am trying to convert a project file from ETAP to SKM. Below is the ETAP utility operating value and also SC value. Which value I should key in to SKM setting? Should be SC value, right? The analysis should consider the higher current that go the system. Correct me if I am wrong.
I am trying to convert a project file from ETAP to SKM. Below is the ETAP utility operating value and also SC value. Which value I should key in to SKM setting? Should be SC value, right? The analysis should consider the higher current that go the system. Correct me if I am wrong.