Hello, I have been given a task to conduct a review on impact assessment of irrigation pipeline construction on existing bridge (pipelines will be constructed 2.0 meter far from existing railway bridge wall on sandy soil and depth of 6 meter below existing ground level). What are the key things to check and consider when excavating near existing bridges? (I have noticed from the report, that volume loss due to the tunneling process, has significant effects on the supporting piles if volume loss were greater than certain limits.)