jdbpe
Structural
- Aug 4, 2005
- 28
I have a project where a 2 inch, 20 gage metal deck was specified to support a 5 1/2 total concrete slab depth. During the design phase, column center lines increased and the spacing of beams increased. It turns out that the 2 inch metal deck that was specified has an unsupported span of 8'-10". The deck tables indicate for a three span condition that the deck can only span unsupported during construction 8.45 feet. Our clear span is 5 inches more than the table allows. The concrete has been poured. How big of a problem is this ? Analysis indicates that our total load will be 170 psf. The tables indicate that it can support 285 psf as a composite structure.