darthsoilsguy2
Geotechnical
- Jul 17, 2008
- 579
Have a small community water system with an existing atmospheric horizontal capsule-shaped or pill-shaped 8,000 gallon FRP tank. We're doing some upgrades to the distribution system and want to include adding a 2" penetration to make an overfill line for the storage tank. i'm curious if there are gasketed fittings out there and if the community has crossed this before and handled it differently. Also interested in procedures if necessary to make the penetration. we have a manway at the top, a 3" normal vent opening at the very top of the tank, a 2" nozzle outlet at the bottom, and a 1" nozzle above the high water mark.