A two story office building will be constructed inside existing industrial building. The existing building has movement joints (expansion joints)on concrete floor. The new two story building (135'X45') will be built crossed over existing concrete slab expansion joints. New building will not be attached to existing building structure. Steel frame with steel stud wall will be used for the construction of the new two story building. would it be any problem if the new building constructed over the expansion joint?