I was checking the thread794-326793 which is closed so I start a new one with similar subject. I need to prepare the procedure for the filling of one drain vessel and one pig launcher/receiver with nitrogen for conservation purpose. These vessels are part of pipeline and need to be protected because that part of pipeline shall be not used in a next 4-5 years. As my assumption, I guess that vessel have to be isolated from the rest of pipeline, all openings closed, then use one nozzle to introduce nitrogen inside and leave one vent open until all air is replaced with nitrogen. After that all nozzles shall be closed. Can anyone tell me if I'm on the right track and also explain me some details from practice (e.g. which tools do I need, how to know when all air is out etc.)?