Apr 4, 2011
21
I am working on a bridge repair project, and the concrete does have a clear protective sealant on it. There is some discussion as to whether or not this is considered exposed. I am of the opinion that it is exposed to weather; others feel that since it has a sealant, it is not exposed. Which is it, exposed or unexposed?
 
Replies continue below

Recommended for you

Exposed. Sealants don't last that long.
 
Exposed. Moisture gets in somewhere that sealant doesn't exist. Weather gets cold. Concrete spalls. Exposed.
 
I have read that one coat of sealant on wood covers only 1/3 of the "surface". Maybe . . . the second coat would cover 1/3 of the remaining (2/3) exposed surface - -and so it continues.
 
I agree with the others, exposed. I have never heard of sealant allowing otherwise. In additional the sealant could where over time along with the surface of the concrete.
 
Thank you for the quick responses. I'm glad to hear I'm not the only one who thought the condition was exposed.
 
The design life of bridges is generally 50 to 100 years, even a good sealant can only be expected to last in the realm of 10 to 15.

The sealant is just an aid to longevity but is not a substitute for the correct cover e.t.c.
 
What is the composition and purpose of this clear sealant? Without pigmentation, sealants and varnishes will only last a year or so in UV exposure. Maybe it's not a sealant, but an anti-carbonation coating?
 