AeroStructAnalyst
Aerospace
- Aug 4, 2012
- 21
What is rationale behind holding structures under Ultimate load test for 3 seconds accroding to FAR 25 or EASA CS25 Aircraft certification requirements? In terms of structural failures, what is the 3 seconds no failure at ultimate load testing requirement meant to demonstrate? I have asked this question from 'seasoned' Airframers and no satisfactory response was provided, so I am hoping someone out there perhaps can give more insight behind this requirement.