FAA/EASA Ultimate Test 3 seconds requirements : What is the rationale behind it!

Status
Not open for further replies.

AeroStructAnalyst

Aerospace
Joined
Aug 4, 2012
Messages
21
What is rationale behind holding structures under Ultimate load test for 3 seconds accroding to FAR 25 or EASA CS25 Aircraft certification requirements? In terms of structural failures, what is the 3 seconds no failure at ultimate load testing requirement meant to demonstrate? I have asked this question from 'seasoned' Airframers and no satisfactory response was provided, so I am hoping someone out there perhaps can give more insight behind this requirement.
 
It's to ensure it is a "static" test, rather than a dynamic test where the ultimate load is only applied for a millisecond and the dynamic strength increase is used to pass the test.
 
Thanks SWComposite,
I have always thought that was the main reason but I thought there was more justification behind the 3 seconds.
 
It was could have something to do with the capabilities of the instrumentation systems long ago and the time required to record data ( or write down the data manually, long, long ago).
 
long ago someone picked a number ... count to three, that'll do.

and that became the standard ...