GalileoG
Structural
- Feb 17, 2007
- 467
A fabricator that we do not usually deal with is going to go ahead with fabrication using IFA drawings, as we have refused to submit IFC drawings until we get stamped engineering drawings. They went ahead with fabrication to meet their erection deadline. Though, the IFA drawings were submitted a week late, so they opted out to skip the process and proceed on the IFA drawings. How should one usually deal with a situation like this?