GC_Hopi
Structural
- Jun 24, 2018
- 547
How are people handling substitution request for deck fastening to open web joists? Is the contractor/third party engineer requesting the substitution responsible for checking strength, stiffness, base material thickness and does this need to be sealed or should the EOR include this re-design effort in the submittal review? Curious to see what others.