We have a 30kV switchgear lineup with tied section A and B. The tie breaker is normally open. However, it will be closed for a paralled incoming operation not more than 20 seconds before switching for maintenance . The worst case of fault level on 30kV bus is parallel incoming operation with closed tie breaker. What is the fault level when we design? The parallel operation with closed tie breaker or separate operatin of section A and B with open tie breaker?
Thanks,
Parkpower
We have a 30kV switchgear lineup with tied section A and B. The tie breaker is normally open. However, it will be closed for a paralled incoming operation not more than 20 seconds before switching for maintenance . The worst case of fault level on 30kV bus is parallel incoming operation with closed tie breaker. What is the fault level when we design? The parallel operation with closed tie breaker or separate operatin of section A and B with open tie breaker?