Respawn
Structural
- Sep 28, 2020
- 64
This was based on a precast hybrid moment frame project of a parking structure. This was my attempt at a cpm diagram for it. Does this seem correct? Did I miss anything? Trying to be near the averages for each task nationally.
[URL unfurl="true"]https://res.cloudinary.com/engineering-com/image/upload/v1613622193/tips/CPM_zs1t7e.pdf[/url]
[URL unfurl="true"]https://res.cloudinary.com/engineering-com/image/upload/v1613622193/tips/CPM_zs1t7e.pdf[/url]