I have a contracter that wants to add his own fiber to concrete mixers on site.This will save him money.I don't have a problem with him saveing some money.
He called me and ask if I would mind.He has indicated that he is going to use the same 1 lb bags as are used at the concrete plant,dump in ten per truck,and spin for 5 min.
Well the plant does it the same way,but I am feeling concerned about him doing it right.This is a sub for wire in the slab and will save him more money.
How do we feel about fiber over wire,and letting him mix the fiber on site?
I am looking for comments
Thank
He called me and ask if I would mind.He has indicated that he is going to use the same 1 lb bags as are used at the concrete plant,dump in ten per truck,and spin for 5 min.
Well the plant does it the same way,but I am feeling concerned about him doing it right.This is a sub for wire in the slab and will save him more money.
How do we feel about fiber over wire,and letting him mix the fiber on site?
I am looking for comments