manofstl
Structural
- Apr 21, 2005
- 17
So, without telling anyone, Contractor decided to substitute fiber reinforced concrete instead of the Vulcraft metal deck with concrete/6x6WWF I spec'd for a second floor. Now he calls, wanting approval from yours truly so the job can proceed. I checked with Vulcraft to see if the FRC is an acceptable substitute, and they (understandably) have no position either way.
Anyone run into this scenario before?
Anyone run into this scenario before?