Hello
A contractor is backfilling with excavated soil against a concrete structure. The backfill matarial has been approved by the designer. The designer requirement is laying and compacting the backfill max in 300mm layers . The height of fill is approx 6 m
The backfill contractor wants to lay 3 layers of each 300 mm and then test it using a nuclear guage ( probably saving time and costs)
Can testing for all 3 layers or more together acceptable?
What is the limitation of testing(depths) of a nuclear guage.
Thank you all
A contractor is backfilling with excavated soil against a concrete structure. The backfill matarial has been approved by the designer. The designer requirement is laying and compacting the backfill max in 300mm layers . The height of fill is approx 6 m
The backfill contractor wants to lay 3 layers of each 300 mm and then test it using a nuclear guage ( probably saving time and costs)
Can testing for all 3 layers or more together acceptable?
What is the limitation of testing(depths) of a nuclear guage.
Thank you all