makrands9
Mechanical
- Aug 6, 2009
- 1
thread794-264881
Dears,
Have anyone came across the situation, wherein field hydrotest of tall packed column & trayed column is carried out in-situ condition without removing packed beds (structured packing, trough distributors, chimney trays, etc. in place) & trays (valve trays)?