The crew showed up yesterday and did the dirt work and formed up for a 34 yard pour for my carport and driveway. At 3 o’clock in the afternoon the first concrete truck showed up and the last truck left at around 7:30pm. The finishers made the first skreet and smoothed it all out pretty good. They were waiting so they could start their power trowel and went as far as to place the machine on the concrete. Unbeknownst to me, as I am a police officer and had to go on duty, at this point they left the job. It was not until late the next morning that I found out my driveway was unfinished with gravel showing in spots. I called them and they told me they were on their way to finish it up. I thought his should have been completed last night but they told they would do it today. They arrived early afternoon and began roughing it with cinder blocks then they sprinkled it with Portland cement and began to power trowel it. They said they do this all the time and it will be just fine because the concrete is still green. Is there anyone that can shed some light on this procedure? It seems to me that the surface will not last due to poor adhesion. Thanks all, when I saw my drive I was the one that was GREEN. Gary