whoppo
Mechanical
- Sep 5, 2001
- 2
I am doing some work for a government facility that requires fire protection. I can design the system for the entire site except for the sections of the buildings which are EMP (electro magnetic pulse) tunnels. One possible fix I've been considering is to use Schedule 80 PVC designed for fire protection purposes. I just thought I'd throw this out there to see if anyone has any thoughts/experience with this. Thanks