dracula
Petroleum
- May 25, 2012
- 4
A tank (60.97mtr dia) (having floating roof) need to fill with water (height of the tank 18mtr)for hydro test purpose, the NEW 6" piping routing ( please see the attachment) providing from an EXISTING FIRE LINE HEADER which 88mtr long from the tank's 4" nozzle,
how to find the flow rate of the 6" new pipe?
please give me the formula with an example!
how to find the flow rate of the 6" new pipe?
please give me the formula with an example!