itchynackers
Civil/Environmental
- Aug 27, 2007
- 3
I'd like to split a flow from a link into 2 parts. All runoff up to the 2 year event will go one direction (into pond a), and all flow above the 2 year event in another direction (overland flow to pond b). I can get the link to split by keying in the actual maximum cfs to go to pond a, but it seems tedious to do that. Can I just tell it "up to 2 year event go here, and over that go there? Is there a better method?
Thanks, Adam
Thanks, Adam