Inspector807
Specifier/Regulator
- Jul 3, 2002
- 11
Is it possible to design a footing on a filled lot that used to be a creek bed but was diverted to be able to fill the area and build houses there, without having soil tests done, a local engineer has done this and i was curious if this was common, a lot up the street was tested about 3yrs ago and found that a great deal of removal of the fill had to be done and many other things had to be done before the lot could be built on, and now a builder has built on a lot in this same area, without getting any testing. He poured his footing without the approval of the building dept because he said an engineer told him what he was doing was fine ( but the engineer did not provide a letter of his approval to us)but did tell the building official it would be ok,the ditch was 3' wide has 12"s of concrete 4"s under grade and 2 #4's on chairs in the center of the ditch ( the engineer did not ask for rebar) any help understanding why he was not required to find out in more detail what he was building on top of before he continued and is it better to leave the fill undesturbed instead of digging it out?