theclipper
Structural
- Jan 16, 2003
- 24
Good afternoon fellas,
Often times I run across specs that call for the top 6" of footing subgrade to be compacted to 95%.
As a structural engineer who doesn't have the full soil knowledge of a geotech this makes no sense to me. This requires a proctor to be pounded which I also feel is useless data since the insitu subgrade is not the same from location to location in the trench.
I want to rewrite our office spec so that it basically put the honus on the GC to achieve required design bearing capacity.
What are your guys' thoughts on this subject?
Often times I run across specs that call for the top 6" of footing subgrade to be compacted to 95%.
As a structural engineer who doesn't have the full soil knowledge of a geotech this makes no sense to me. This requires a proctor to be pounded which I also feel is useless data since the insitu subgrade is not the same from location to location in the trench.
I want to rewrite our office spec so that it basically put the honus on the GC to achieve required design bearing capacity.
What are your guys' thoughts on this subject?