What is the optimal number of crawler cranes needed to help rigs do their jobs?
1. in dry conditions (no need for tremie pipe)
2. in wet conditions with the need for tremie
Also is it usual for the piling contractor to own those cranes, or shall he leases them?
Regards
1. in dry conditions (no need for tremie pipe)
2. in wet conditions with the need for tremie
Also is it usual for the piling contractor to own those cranes, or shall he leases them?
Regards