gomirage
Civil/Environmental
- Oct 4, 2003
- 53
I have been given the task of comparing two altertnates.
Either build a WWTP on site for treating industrial/domestic waste or construct a sewer force main to take the waste 10 miles and connect to an exist sewer system. I am starting with the second alternate, meaning estimating the cost of a 10 miles forcemain. Can anyone give me some help regarding:
-- Some documentation on parameters to consider for the design of a FM.
-- Types and cost of pipes, lift stations, etc.
-- Some hydraulic models
-- etc.
any help will be greatly appreciate.
Thank you.
Either build a WWTP on site for treating industrial/domestic waste or construct a sewer force main to take the waste 10 miles and connect to an exist sewer system. I am starting with the second alternate, meaning estimating the cost of a 10 miles forcemain. Can anyone give me some help regarding:
-- Some documentation on parameters to consider for the design of a FM.
-- Types and cost of pipes, lift stations, etc.
-- Some hydraulic models
-- etc.
any help will be greatly appreciate.
Thank you.