- Apr 22, 2023
- 13
Working on a residential project on a sloped property. The current footing drain pipe is pitched and drains to day light at rear of property. There is a proposed retaining wall (4ft tall, 14 ft long) to be butted up/ perpendicular to house foundation. Can the retaining wall foundation drain tie-in/ connect to the house footing drain before terminating to daylight or do they have to terminate to daylight separately?
Thank you
Rob C