Hello guys, in my work we are building foundation piles 9m deep and in all the excavations we have not seen any sign of water.
The supervisor want us to destroy the first 50 cm to descontaminate the concrete, and I tell him there is no need, I'm I wrong?
Thanks
The supervisor want us to destroy the first 50 cm to descontaminate the concrete, and I tell him there is no need, I'm I wrong?
Thanks