Lesali
Structural
- Jul 10, 2008
- 21
I'm working on a project with an exposed mat foundation - 30" thick. It will be subject to freeze thaw cycles. I plan on using 3000 psi w/ 7% AE. I have a few questions on what more I can do to ensure durability.
[ol 1]
[li]Would a concrete sealer be of help for the slab?[/li]
[li]And, I will need some construction joints. Has anyone used PVC water stops (or some other product) to prevent water getting into the joints and causing cracking?[/li]
[li]And how about the grout under base plates. I've seen cases where the exposure has decimated the grout. Is there a solution here? One supplier suggested it is impossible to add Air Entrainment to grout.[/li]
[/ol]
[ol 1]
[li]Would a concrete sealer be of help for the slab?[/li]
[li]And, I will need some construction joints. Has anyone used PVC water stops (or some other product) to prevent water getting into the joints and causing cracking?[/li]
[li]And how about the grout under base plates. I've seen cases where the exposure has decimated the grout. Is there a solution here? One supplier suggested it is impossible to add Air Entrainment to grout.[/li]
[/ol]