amine1340
Mechanical
- Apr 7, 2018
- 7
dear Gents , I hope everyone is having a nice day,
Im working on an a design of full containment LNG tank, there is already an existing tank and we are supposed to design the new tank as the existing one
the issue I,m puzzled about is the internal piping ( purging lines, balancing lines ..etc) some of them are routed through the concrete tank but for the new tank the contractor chose to route them through the annular space (which will be filled with perlite).
my question is which option is better on the long run to avoid any leaks especially for routing it through inner space it might be subject to perlite loads during cooldown.
thank you in advance
Im working on an a design of full containment LNG tank, there is already an existing tank and we are supposed to design the new tank as the existing one
the issue I,m puzzled about is the internal piping ( purging lines, balancing lines ..etc) some of them are routed through the concrete tank but for the new tank the contractor chose to route them through the annular space (which will be filled with perlite).
my question is which option is better on the long run to avoid any leaks especially for routing it through inner space it might be subject to perlite loads during cooldown.
thank you in advance