I'm working on a project that is a building re-model. The building is an early nineteenth century brick masonry structure (4 stories) with timber framing at the interior. The building is being transformed to a library and will use the "box in a box" approach where the existing three-wythe masonry walls will be maintained and all new steel framing will be dropped in as the primary gravity structure.
The brick construction is made of two wythes at the exterior with a 1" air gap and a third wythe at the interior tied together with header bricks every 6 courses. The engineer I am working on feels hesitant about the air gap, even though my calculations show the wall works just fine as a two wythe wall for gravity and out of plane bending based on the unbraced length of the wall.
I'm curious if anyone has experience fully grouting and pinning walls. What pitfalls are there? What are the major challenges? I am assuming we want to drop steel columns all around the perimeter to fully brace the walls during construction. What other work would be involved?
Are there any engineering articles from trade magazines or journal articles you could point me to?
Thanks in advance for your consideration.
I'm working on a project that is a building re-model. The building is an early nineteenth century brick masonry structure (4 stories) with timber framing at the interior. The building is being transformed to a library and will use the "box in a box" approach where the existing three-wythe masonry walls will be maintained and all new steel framing will be dropped in as the primary gravity structure.
The brick construction is made of two wythes at the exterior with a 1" air gap and a third wythe at the interior tied together with header bricks every 6 courses. The engineer I am working on feels hesitant about the air gap, even though my calculations show the wall works just fine as a two wythe wall for gravity and out of plane bending based on the unbraced length of the wall.
I'm curious if anyone has experience fully grouting and pinning walls. What pitfalls are there? What are the major challenges? I am assuming we want to drop steel columns all around the perimeter to fully brace the walls during construction. What other work would be involved?
Are there any engineering articles from trade magazines or journal articles you could point me to?
Thanks in advance for your consideration.