Guest
My contractor just poured foundation last week.
He is already framing, is this normal to do this so quick, also the foundation is not smooth, some places you could see
Small rocks exposed 6" wide by 6'feet long.
Should I be worried?
He is already framing, is this normal to do this so quick, also the foundation is not smooth, some places you could see
Small rocks exposed 6" wide by 6'feet long.
Should I be worried?