aka2
Petroleum
- Feb 12, 2008
- 7
I have to design a gas facility dealing with 22000 ppm H2S, 5.5% CO2 and water content. I reviewed NACE MR0175 part 1, 2 and 3 but I wonder wich pipe spec should I use, pipe material, pipe fittings and if I can use carbon steel threaded fittings 1/2" diameter.