For a TEG unit in an on-shore location with limited cooling water what would be the preferred solution for a large scale (450,000 Nm3/hr gas) TEG column for lean glycol temperature adjustment downstream the glycol/glycol HX:
-Adjust glycol temperature before contactor by use of exit gas
- Adjust glycol temperature by use of air cooling/closed loop water cooling
Best regards
Morten