rhatcher
Electrical
- Jan 17, 2001
- 636
Hi,
We have a machine equipped with a GE Series One PLC. The CPU failed and the program was not retrievable. I have the ladder logic and have written the Boolean/keystroke version of the program to be keyed into the programming module in order to load the logic into the PLC.
I am not sure about the use of "push-down" stacks (OR-STR-ENT) in the program and am hoping that someone can review the program and ladder logic to see if I did it right. Examples of this function are found in Rungs 1 and 24.
Thanks.
We have a machine equipped with a GE Series One PLC. The CPU failed and the program was not retrievable. I have the ladder logic and have written the Boolean/keystroke version of the program to be keyed into the programming module in order to load the logic into the PLC.
I am not sure about the use of "push-down" stacks (OR-STR-ENT) in the program and am hoping that someone can review the program and ladder logic to see if I did it right. Examples of this function are found in Rungs 1 and 24.
Thanks.