Jokenda
Mechanical
- Apr 29, 2010
- 2
I am thinking of using Gear Track to transport a trolley in conjunction with Steel Tubing. I have had experience with large applications but the scale I am working with is much smaller.
The distance of travel is 6'.
the size of the tubing can be 0.5 to 1" O.D.
Duration of forward travel 5 seconds
Duration of return travel 1 second
Is this achievable?
The only gear track I have located is Flat Mount. I would like a concave mount if available, I do not wish to have the cost of milling to fit track to rail.
A list of suppliers would be appreciated.
Thank you,
Jokenda
The distance of travel is 6'.
the size of the tubing can be 0.5 to 1" O.D.
Duration of forward travel 5 seconds
Duration of return travel 1 second
Is this achievable?
The only gear track I have located is Flat Mount. I would like a concave mount if available, I do not wish to have the cost of milling to fit track to rail.
A list of suppliers would be appreciated.
Thank you,
Jokenda