AHSEN_MEP
Electrical
- Jan 14, 2023
- 5
We have 1250kva two generators of CAT which is giving output of 400voltage . These genset will be connected to synchronizing panel. After Sync Panel we will connect it with 2500KVA step up transformer .4/11kv .
This transformer will convert voltage into 11kv . vector group of this transformer is YNd 11 so primary side of transformer has three busing and secondary side has four bushings . neutral bushing will be grounded and generator neutral will also be grounded .
i need to know that this vector group is ok and will work or we need to change vector group .
secondly please confirm that as there is no neutral at primary/LV side so there will be no neutral in synchronizing panel and ACB breakers will be three pole
below link is data sheet of transformer
[URL unfurl="true"]https://res.cloudinary.com/engineering-com/image/upload/v1673704708/tips/2500_11_0.4_YNd_11_irh1ew.pdf[/url]
This transformer will convert voltage into 11kv . vector group of this transformer is YNd 11 so primary side of transformer has three busing and secondary side has four bushings . neutral bushing will be grounded and generator neutral will also be grounded .
i need to know that this vector group is ok and will work or we need to change vector group .
secondly please confirm that as there is no neutral at primary/LV side so there will be no neutral in synchronizing panel and ACB breakers will be three pole
below link is data sheet of transformer
[URL unfurl="true"]https://res.cloudinary.com/engineering-com/image/upload/v1673704708/tips/2500_11_0.4_YNd_11_irh1ew.pdf[/url]