Adam1980
Electrical
- Feb 17, 2012
- 87
Dear all,
is there any considerable problems of paralleling generators' GSUs with OLTC to the same busbar.
will there be any problem if operating the OLTC action is delayed from the first generator on the busbar to the last one?
This question is concerning thermal power plants with several generators (> 200 MW).
Thank you.
is there any considerable problems of paralleling generators' GSUs with OLTC to the same busbar.
will there be any problem if operating the OLTC action is delayed from the first generator on the busbar to the last one?
This question is concerning thermal power plants with several generators (> 200 MW).
Thank you.