EETD
Electrical
- Jul 9, 2004
- 10
I am applying a 600kW primary service diesel generator at a manufacturing factility with an 8 to 10 hour production shift. A small load (i.e. 30 to 60kW) would need to be maintained for the remainder of the day.
In general, when the facility is not in operation (16 hours a day) is it better to:
a) Let the generator run at 5 to 10% of its full capacity, or
b) switch off the main generator during that period and use a smaller generator to supply the nighttime load?
Thanks is advance for your thoughts.
Regards,
EETD
In general, when the facility is not in operation (16 hours a day) is it better to:
a) Let the generator run at 5 to 10% of its full capacity, or
b) switch off the main generator during that period and use a smaller generator to supply the nighttime load?
Thanks is advance for your thoughts.
Regards,
EETD