PEFLWI
Structural
- Oct 23, 2012
- 120
I am a PE in two states and the company I work for provides equipment and structural supports for the utility industry all over the country. I am interested in becoming an SE. In the past states required both the Structures I and Structures II test. I understand that each state is different, but that most states now require a 16 hour test to get an SE license. Is that correct? I have passed the Structures I test in 2001. Does that mean I am still required to take the full 16 hour test? If I take the test for one state, do other states recognize this? For example, I was considering getting an Illinois SE. Would California recognize this or do they require additional testing?