hoganh
Mechanical
- Oct 29, 2002
- 11
I've got an assembly with with hundreds of sub-assembly configurations. Each top level assembly is a configuration of the various sub-assembly configurations. In the top level assemblies I can move the interconnected 4-bar linkage configurations.
The problem I'm having is that Solidworks *sometimes* uses a second (mathmatically valid) solution, where the linkage has been toggled over-center, so it is in the improper position.
How can I force Solidworks to only find the proper solution (ie. a particular lever pointing in a general orientation)? I tried constraining a point on the linkage to a fixed planar surface but that didn't work.
Thanks!
The problem I'm having is that Solidworks *sometimes* uses a second (mathmatically valid) solution, where the linkage has been toggled over-center, so it is in the improper position.
How can I force Solidworks to only find the proper solution (ie. a particular lever pointing in a general orientation)? I tried constraining a point on the linkage to a fixed planar surface but that didn't work.
Thanks!