s1490
Civil/Environmental
- Nov 8, 2019
- 1
I am the structural transmission line design engineer for my utility. For the first time, we will be using a 3-way GOAB at one our taps as part of a rebuild. I reached out to Protection and Control, as well as Communications for a recommendation on the switch as electrical/comms wasn't my forte, and figured I'd design a pole to hold whatever they recommend and handle the structural loads.
They came back and said they did not really have anything to do with that. I figured modern GOAB's could have some SCADA integration or some other uses applicable to protection or comms.... is that not the case?