Youcef-OilGas
Petroleum
- Nov 7, 2021
- 12
Hi All,
We have been asked as Client for approval to make 02 Golden Joints (to avoid Hydrotest) on 18'' SS piping THK 48-50mm, in order to fix a misalignement of this line. This line has been already hydrotested (Design pressure 106bar).
Can somebody give me a technical point of view, if it's acceptable or not & if there is any Standard ruling this type of job?
Thanks.
We have been asked as Client for approval to make 02 Golden Joints (to avoid Hydrotest) on 18'' SS piping THK 48-50mm, in order to fix a misalignement of this line. This line has been already hydrotested (Design pressure 106bar).
Can somebody give me a technical point of view, if it's acceptable or not & if there is any Standard ruling this type of job?
Thanks.