bumbler
Structural
- Apr 15, 2022
- 20
Hello all,
We have a 5-on-2 with a foundation system consisting of augercast piles connected by grade beams. We have a pour strip at our podium slab that is roughly centered in the building floor plan. The contractor is now requesting that we add construction joints at all slabs-on-grade, concrete walls, grade beams, and the lower PT slab near this upper pour strip so that they can construct in two phases. I figure that because the grade beams are supported on the augercast piles, the best locations for the construction joints are centered on the piles with a pinned condition at the construction joint. The piles are embedded into the grade beams with headed deformed bars.
Any thoughts on this approach or on the overall feasibility of the phased construction? See attached sketch where I've marked the proposed construction joint and highlighted piles for one of the affected grade beams.
We have a 5-on-2 with a foundation system consisting of augercast piles connected by grade beams. We have a pour strip at our podium slab that is roughly centered in the building floor plan. The contractor is now requesting that we add construction joints at all slabs-on-grade, concrete walls, grade beams, and the lower PT slab near this upper pour strip so that they can construct in two phases. I figure that because the grade beams are supported on the augercast piles, the best locations for the construction joints are centered on the piles with a pinned condition at the construction joint. The piles are embedded into the grade beams with headed deformed bars.
Any thoughts on this approach or on the overall feasibility of the phased construction? See attached sketch where I've marked the proposed construction joint and highlighted piles for one of the affected grade beams.