Bravo8
Civil/Environmental
- Jun 19, 2017
- 2
I use a minimum of 2% slopes in gravel parking lots. My client wants to use 1% slopes due to the amount of fill that will need to be brought in from off-site. I explained the risks of using a slope less than 2% to the client, but he is willing to take the risks. Will I be liable when potholes and ponding water develop if I follow through with what the clients wants?