Hi,
i am hoping someone will be able to offer me some help with the following query in as simplistic fashion as possible.
Take a typical 25m swimming pool with an overflow channel around the perimeter of the pool. Assumiing the flow into this channel is 200m3/hr. In the base of the channel (typically at one end of the pool) will be 1.5m long vertical drainage pipe/s into a tank (say 6" max. upvc).
The channel can be assumed to be 400mm deep x 200mm wide. The water depth must not exceed 100mm
My query is how many 6" pipes would be required to drain away this 200m3/hr? how is this calculated and how can i work this out for different scenarios?
any help would be really appreciated.
thankyou
i am hoping someone will be able to offer me some help with the following query in as simplistic fashion as possible.
Take a typical 25m swimming pool with an overflow channel around the perimeter of the pool. Assumiing the flow into this channel is 200m3/hr. In the base of the channel (typically at one end of the pool) will be 1.5m long vertical drainage pipe/s into a tank (say 6" max. upvc).
The channel can be assumed to be 400mm deep x 200mm wide. The water depth must not exceed 100mm
My query is how many 6" pipes would be required to drain away this 200m3/hr? how is this calculated and how can i work this out for different scenarios?
any help would be really appreciated.
thankyou