With another cladding fire in Daubi - lets take a look at the progress in the Grenfell Tower Inquiry
As the Grenfell Tower Inquiry prepares to return for closing statements, Peter Apps recaps some of the evidence relating to the testing, sale and certification of materials used in the building’s cladding system
Grenfell Tower Inquiry recap: module two – the cladding; INSIGHT 01.11.22 7.00 AM BY PETER APPS
At the bottom of this article, there is a summary by week of each of the 84 weeks of testimony so far.
Will the cost ever reach a point where the ACM panel hazard is removed from buildings?
With another cladding fire in Daubi - lets take a look at the progress in the Grenfell Tower Inquiry
As the Grenfell Tower Inquiry prepares to return for closing statements, Peter Apps recaps some of the evidence relating to the testing, sale and certification of materials used in the building’s cladding system
Grenfell Tower Inquiry recap: module two – the cladding; INSIGHT 01.11.22 7.00 AM BY PETER APPS
At the bottom of this article, there is a summary by week of each of the 84 weeks of testimony so far.
Will the cost ever reach a point where the ACM panel hazard is removed from buildings?